Project: Bovine-RV14A   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Jeff Lawson   -  
Project:   Vans - RV-14A   -   VIEW REPORTS
Total Hours:601.5
Total Flight Time:
Start/Last Date:Jan 28, 2022 - No Finish Date
Engine:Lycoming YIO-390-EXP119 non-cert
Propeller:Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:Dynon Skyview
 
Friendly URL: https://eaabuilderslog.org?s=Bovine-RV14A

Home or Last Project Picture

Jan 25, 2023     Finishing the right fuel tank - (1.0 hour)       Category: Fuel Tanks
Tonight I removed the remaining clecos from the holes in the skin that were holding the rear baffle in place while the tank sealant was setting. These remaining holes were the ones that the instructions said to leave without countersinking so that the clecos would have maximum holding strength. So these holes were countersunk to allow flush rivets, and those were then hand squeezed in.

What's next? Both fuel tanks just need their fuel senders to be installed permanently with tank sealant and screws.


 